SR-279 over MOAB CANYON WASH
AT INTERSEC. WITH SR-191 · County 019, Utah · Built 1963 · 2 Lanes · 478 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
38.605944, -109.602444
This bridge is in worse condition than 42.1% of bridges in County 019. The average bridge in Utah is 0 years old; this one is 63 years old.
Nearby Bridges
SR-279 over TAILINGS DEPOSAL HAUL RD
Built 2010
US-191 over MOAB CANYON WASH
Built 2004
PARK ENTRANCE ROAD over MOAB WASH
Built 2003
US-191 (SR-191) over LOWER COURTHOUSE WASH
Built 1991
US-191 SB (SR-191) over COLORADO RIVER
Built 2010
US-191NB (SR-191) over COLORADO RIVER
Built 2010
PARK ENTRANCE ROAD over COURTHOUSE WASH
Built 1957
500 WEST STREET over PEDESTRIAN WALKWAY
Built 2003
500 WEST STREET over MILL CREEK
Built 1969
SR-279 over UNNAMED WASH
Built 1962
Bridge Details
- Structure #
- 0E1287
- Year Built
- 1963
- Length
- 9.1 m (29.9 ft)
- Max Span
- 4.3 m
- Lanes
- 2
- Daily Traffic
- 478
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.