SR-39 over NO.BR.SO.FK.OGDEN RIVER

3.8 MI.EAST PINEVIEW DAM · County 057, Utah · Built 1957 · 2 Lanes · 6,768 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
0E1100
Year Built
1957
Length
12 m (39.4 ft)
Max Span
10.9 m
Width
26.9 m (88.3 ft)
Lanes
2
Daily Traffic
6,768
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.