US-191 (SR-191) over PACK CREEK
SO. END OF MOAB MAIN ST · County 019, Utah · Built 1955 · 5 Lanes · 20,310 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
38.564431, -109.549836
This bridge is in worse condition than 80.2% of bridges in County 019. The average bridge in Utah is 0 years old; this one is 71 years old.
Nearby Bridges
300 SOUTH STREET over MILL CREEK
Built 1972
400 EAST STREET over PEDESTRIAN UNDERPASS
Built 1999
400 EAST STREET over MILL CREEK
Built 1972
400 EAST STREET over PACK CREEK
Built 1972
US-191 (SR-191) over MILL CREEK
Built 1956
500 WEST STREET over MILL CREEK
Built 1969
500 WEST STREET over PEDESTRIAN WALKWAY
Built 2003
1000 EAST STREET over MILL CREEK
Built 1977
MILL CREEK DRIVE over PACK CREEK
Built 2011
US-191NB (SR-191) over COLORADO RIVER
Built 2010
Bridge Details
- Structure #
- 0E1037
- Year Built
- 1955
- Reconstructed
- 1971
- Length
- 18.7 m (61.4 ft)
- Max Span
- 8.8 m
- Lanes
- 5
- Daily Traffic
- 20,310
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.