SR-134 over WILLARD CANAL

3.2 MI.EAST of PLAIN CITY · County 057, Utah · Built 1962 · 2 Lanes · 3,930 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0D 804
Year Built
1962
Length
24.6 m (80.7 ft)
Max Span
9.1 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
3,930
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.