US-89 (SR-89) over CLEAR CREEK

0.4 MI.SO.OF SEVIER JCT. · County 041, Utah · Built 1929 · 2 Lanes · 1,559 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
0D 764
Year Built
1929
Reconstructed
1967
Length
14.9 m (48.9 ft)
Max Span
13.4 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
1,559
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.