SR-66 over EAST CANYON CREEK

WITHIN PORTERVILLE · County 029, Utah · Built 1934 · 2 Lanes · 1,373 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
0D 377
Year Built
1934
Length
9.8 m (32.2 ft)
Max Span
9.1 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
1,373
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.