SR-12 over WATER CANYON WASH
4.0 MILES EAST TROPIC JCT · County 017, Utah · Built 1962 · 2 Lanes · 1,703 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.666156, -112.110125
This bridge is in worse condition than 47.3% of bridges in County 017. The average bridge in Utah is 0 years old; this one is 64 years old.
Nearby Bridges
SR-12 over CAMPBELL CREEK
Built 1958
TOWN ROAD over BRYCE CREEK
Built 1990
TOWN ROAD over PARIA RIVER
Built 1985
SR-12 over BRYCE CANYON WASH
Built 1959
NFSR 30298 over E.FORK SEVIER
Built 1977
COUNTY ROAD over NORTH CANYON WASH
Built 2000
COUNTY ROAD over PARIA RIVER
Built 1987
SR-12 over EAST FORK SEVIER RIVER
Built 1961
COLLECTOR ROAD over E. FORK SEVIER RIVER
Built 1962
SR-12 over PARIA RIVER
Built 1957
Bridge Details
- Structure #
- 0D 245
- Year Built
- 1962
- Length
- 18.3 m (60 ft)
- Max Span
- 11 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,703
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.