I-215 (SR-215) over I-80 (SR-80)

I215-I80 INTCHG.W.OF SLC. · County 035, Utah · Built 1985 · 6 Lanes · 96,167 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
0C 692
Year Built
1985
Length
102 m (334.6 ft)
Max Span
52.3 m
Width
42.2 m (138.5 ft)
Lanes
6
Daily Traffic
96,167
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.