SR-20 INT.X-ROAD over I-15 (SR-15) NBL & SBL
BEAR VALLEY INTERCHANGE · County 021, Utah · Built 1979 · 2 Lanes · 2,035 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
38.071833, -112.688789
This bridge is in worse condition than 23.2% of bridges in County 021. The average bridge in Utah is 0 years old; this one is 47 years old.
Nearby Bridges
COUNTY ROAD over FREMONT WASH
Built 1939
I-15(SR-15)NB&Ramp over FREMONT WASH
Built 1956
CO.RD.-BUCKHORN FL over I-15 (SR-15) NBL & SBL
Built 1979
I-15 (SR-15) NBL over COUNTY ACCESS ROAD
Built 1975
COUNTY RD.INT.X-RD over I-15 (SR-15) NBL & S
Built 1984
I-15 (SR-15) SBL over DEER CROSSING
Built 1984
I-15 (SR-15) NBL over DEER CROSSING
Built 1975
I-15 (SR-15) SBL over COUNTY ACCESS ROAD
Built 1975
Bridge Details
- Structure #
- 0C 658
- Year Built
- 1979
- Length
- 88.7 m (291 ft)
- Max Span
- 44 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,035
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.