SR-20 INT.X-ROAD over I-15 (SR-15) NBL & SBL

BEAR VALLEY INTERCHANGE · County 021, Utah · Built 1979 · 2 Lanes · 2,035 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

38.071833, -112.688789

This bridge is in worse condition than 23.2% of bridges in County 021. The average bridge in Utah is 0 years old; this one is 47 years old.

Nearby Bridges

Bridge Details

Structure #
0C 658
Year Built
1979
Length
88.7 m (291 ft)
Max Span
44 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
2,035
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.