SR-30 over GROUSE CREEK

6.1 MI.E. OF NEVADA LINE · County 003, Utah · Built 1963 · 2 Lanes · 455 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 5 Fair

Location

41.407358, -113.936069

This bridge is in worse condition than 77.2% of bridges in County 003. The average bridge in Utah is 0 years old; this one is 63 years old.

Bridge Details

Structure #
0C 459
Year Built
1963
Length
32.4 m (106.3 ft)
Max Span
31.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
455
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.