MONROE BOULEVARD over OGDEN RIVER

1700 MONROE BLVD. OGDEN · County 057, Utah · Built 1984 · 4 Lanes · 15,560 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
057029F
Year Built
1984
Length
44.1 m (144.7 ft)
Max Span
42.7 m
Width
29.3 m (96.1 ft)
Lanes
4
Daily Traffic
15,560
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.