Camino Del Rio Rd over North Creek

Koleb Rd. oer North Creek · County 053, Utah · Built 2014 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
053081D
Year Built
2014
Length
27.4 m (89.9 ft)
Max Span
11.8 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
50
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.