Lehi Main St over Jordan River
Lehi Main St over Jordan · County 049, Utah · Built 2022 · 5 Lanes · 16,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.3874, -111.906
This bridge is in worse condition than 19.3% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 4 years old.
Nearby Bridges
N 2375 W in Lehi over Waste Ditch Canal
Built 2022
SR-145 over JORDAN R. & TRAIL
Built 2010
2300 West in Lehi over Waste Ditch Canal
Built 2017
CO.RD.-9600 NO.ST. over JORDAN RIVER
Built 1995
SR-194 EB over LOCAL ACCESS ROAD
Built 2011
SR-194 EB over JORDAN RIVER
Built 2011
SR-194 WB 2100 No. over LOCAL ACCESS ROAD
Built 2011
SARATOGA SPRGS.RD. over JORDAN RIVER
Built 1967
SR194WB 100 N.ST. over JORDAN RIVER
Built 2011
SR-68 REDWOOD RD. over Ped Trail
Built 2019
Bridge Details
- Structure #
- 049115F
- Year Built
- 2022
- Length
- 34.4 m (112.9 ft)
- Max Span
- 33.5 m
- Width
- 28.6 m (93.8 ft)
- Lanes
- 5
- Daily Traffic
- 16,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.