SUMMIT RIDGE PKWY. over UNION PACIFIC RAILROAD
SUMMIT RIDGE S. OF SANTAQ · County 049, Utah · Built 2007 · 2 Lanes · 300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.949722, -111.816667
This bridge is in worse condition than 48.9% of bridges in County 049. The average bridge in Utah is 0 years old; this one is 19 years old.
Nearby Bridges
I-15 (SR-15) SBL over COUNTY RD INT X-ROAD
Built 1973
I-15 (SR-15) NBL over COUNTY RD.INT.X-ROAD.
Built 1973
I-15 (SR-15) SBL over DEER CROSSING
Built 1973
I-15 (SR-15) NBL over DEER CROSSING
Built 1973
I-15 (SR-15) NBL over SANTAQUIN CANYON ROAD
Built 1989
I-15 (SR-15) SBL over SANTAQUIN CANYON ROAD
Built 1989
US-6 (SR-6) over UNION PACIFIC RAILROAD
Built 2005
I-15 (SR-15) NBL over US-6 (SR-6) INT. X-ROAD
Built 1967
I-15 (SR-15) SBL over SANTAQUIN MAIN ST
Built 1967
CO.RD 6250 WEST ST over HIGHLAND CANAL
Built 2003
Bridge Details
- Structure #
- 049093F
- Year Built
- 2007
- Length
- 46.1 m (151.2 ft)
- Max Span
- 45.6 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 2
- Daily Traffic
- 300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.