CO.RD. 600 EAST ST over HIGHLINE CANAL

10100 S.600 E.SE.SP. FORK · County 049, Utah · Built 1989 · 2 Lanes · 637 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
049045V
Year Built
1989
Length
8.8 m (28.9 ft)
Max Span
7.7 m
Width
21 m (68.9 ft)
Lanes
2
Daily Traffic
637
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.