RIVER ROAD over WEBER RIVER

SOUTH SIDE OF OAKLEY · County 043, Utah · Built 1991 · 2 Lanes · 101 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
043043D
Year Built
1991
Length
9.6 m (31.5 ft)
Max Span
9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
101
Material
Concrete
Design
Frame (except frame culverts)
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.