NO DATA ENTERED over BIRCH CREEK
FERRON CANYON · County 015, Utah · Built 1988 · 1 Lanes · 50 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
39.119167, -111.251667
This bridge is in worse condition than 37.6% of bridges in County 015. The average bridge in Utah is 0 years old; this one is 38 years old.
Bridge Details
- Structure #
- 041002000001037
- Year Built
- 1988
- Reconstructed
- 2015
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.7 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 1
- Daily Traffic
- 50
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.