UINTAH RIVER ROAD over POWER PLANT CANAL
11.4 MI N NEOLA UTAH · County 013, Utah · Built 2000 · 1 Lanes · 150 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
40.597167, -110.116247
This bridge is in worse condition than 67.4% of bridges in County 013. The average bridge in Utah is 0 years old; this one is 26 years old.
Bridge Details
- Structure #
- 040101000001012
- Year Built
- 2000
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7.6 m
- Width
- 4.3 m (14.1 ft)
- Lanes
- 1
- Daily Traffic
- 150
- Material
- Wood or Timber
- Design
- Slab
- Owner
- U.S. Forest Service
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.