South Temple over Parking Tunnel

City Creek/Main St Plaza · County 035, Utah · Built 2007 · 4 Lanes · 11,680 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
035235V
Year Built
2007
Length
8.5 m (27.9 ft)
Max Span
7.2 m
Lanes
4
Daily Traffic
11,680
Material
Concrete
Design
Culvert
Owner
Private (other than railroad)
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.