SEGO LILY DRIVE over EAST JORDAN CANAL

ADJACENT TO JORDAN HIGH · County 035, Utah · Built 1995 · 4 Lanes · 10,566 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
035159V
Year Built
1995
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Lanes
4
Daily Traffic
10,566
Material
Steel
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.