COUNTY ROAD over DRY CREEK

2 MILE W. OF DEVILS SLIDE · County 029, Utah · Built 1927 · 2 Lanes · 7 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
029013D
Year Built
1927
Length
11 m (36.1 ft)
Max Span
9.1 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
7
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.