COUNTY ROAD over DEER CREEK
6 MILES EAST OF BOULDER · County 017, Utah · Built 1994 · 2 Lanes · 25 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
37.853728, -111.355389
This bridge is in worse condition than 33.3% of bridges in County 017. The average bridge in Utah is 0 years old; this one is 32 years old.
Bridge Details
- Structure #
- 017026V
- Year Built
- 1994
- Length
- 6.7 m (22 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.