COUNTY ROAD over RED CREEK
18 MILES WEST OF DUCHESNE · County 013, Utah · Built 2016 · 2 Lanes · 32 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
40.128375, -110.740186
This bridge is in worse condition than 31.5% of bridges in County 013. The average bridge in Utah is 0 years old; this one is 10 years old.
Nearby Bridges
Avintaquin Road over Strawberry River
Built 2022
COUNTY ROAD over RED CREEK
Built 1981
COUNTY ROAD over RED CREEK
Built 1981
COUNTY ROAD over STRAWBERRY RIVER
Built 2002
COUNTY ROAD over STRAWBERRY RIVER
Built 2002
COUNTY ROAD over STRAWBERRY RIVER
Built 2010
COUNTY ROAD over SAND CREEK
Built 2024
COUNTY ROAD over SAND CREEK
Built 1977
COUNTY ROAD over STRAWBERRY RIVER
Built 2002
COUNTY ROAD over STRAWBERRY RIVER
Built 2010
Bridge Details
- Structure #
- 013077C
- Year Built
- 2016
- Length
- 16.8 m (55.1 ft)
- Max Span
- 16.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 32
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.