COUNTY ROAD over FARM CREEK

3 MILES NW. OF TABIONA · County 013, Utah · Built 1978 · 2 Lanes · 69 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013003F
Year Built
1978
Length
12.8 m (42 ft)
Max Span
12.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
69
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.