SR-165 over BLACKSMITH FORK RIVER

North edge of Nibley · County 005, Utah · Built 1991 · 5 Lanes · 14,329 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
005057F
Year Built
1991
Length
22.2 m (72.8 ft)
Max Span
21.3 m
Width
26.1 m (85.6 ft)
Lanes
5
Daily Traffic
14,329
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.