COUNTY ROAD over CORINNE CANAL
1.5 MI.W. BEAR RIVER CITY · County 003, Utah · Built 1991 · 2 Lanes · 32 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
41.608111, -112.161603
This bridge is in worse condition than 35.9% of bridges in County 003. The average bridge in Utah is 0 years old; this one is 35 years old.
Nearby Bridges
CO.RD. FA. #1108 over MALAD RIVER
Built 1951
6400 N over DRAINAGE CANAL
Built 2011
COUNTY ROAD over CORINNE CANAL
Built 2009
SR 13 over MALAD RIVER
Built 1989
COUNTY ROAD over BEAR RIVER
Built 1999
COUNTY RD. FA.#514 over BEAR RIVER
Built 1972
ELWOOD TOWN ROAD over MALAD RIVER
Built 2001
COUNTY ROAD over MALAD RIVER
Built 1978
COUNTY ROAD over CORINNE CANAL
Built 2022
SR 240 6900 N over I-15 NBL & SBL
Built 2018
Bridge Details
- Structure #
- 003049D
- Year Built
- 1991
- Length
- 9.7 m (31.8 ft)
- Max Span
- 9.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 32
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.