16800 N.ST. CO.RD. over WEST CANAL
5750 W. 16800 N. GARLAND · County 003, Utah · Built 1991 · 2 Lanes · 1,373 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
41.813889, -112.158833
This bridge is in worse condition than 35.9% of bridges in County 003. The average bridge in Utah is 0 years old; this one is 35 years old.
Nearby Bridges
17600 N.ST. CO.RD. over WEST CANAL
Built 1948
16800 N.ST FA# 506 over MALAD RIVER
Built 1958
I-15 (SR-15) over FARM ROAD UNDERPASS
Built 1989
I-15 (SR-15) NB&SB over CATTLE UNDERPASS
Built 1989
15600 N.ST. CO.RD. over WEST CANAL
Built 1950
SR-13 over MALAD RIVER
Built 1933
SR-30 over WEST CANAL
Built 1990
4400 W.ST. CO.RD. over WEST CANAL
Built 1960
I-15 (SR-15) NBL over SR-30
Built 1989
COUNTY ROAD over I-15 (SR-15)
Built 1989
Bridge Details
- Structure #
- 003018D
- Year Built
- 1991
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.4 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,373
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.