NAVAJO TRAIL over BEAVER RIVER

0.5 MILE SW. OF BEAVER GC · County 001, Utah · Built 2024 · 1 Lanes · 100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
001015E
Year Built
2024
Length
8.9 m (29.2 ft)
Max Span
8.9 m
Width
6.9 m (22.6 ft)
Lanes
1
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.