COUNTY ROAD over DRY WASH

5.8 MILES SO. OF MILFORD · County 001, Utah · Built 2005 · 2 Lanes · 945 vehicles/day

Overall
Good
Culvert
7
Good

Condition Ratings

ComponentRatingDescription
Culvert 7 Good

Location

38.306111, -113.009967

This bridge is in worse condition than 34% of bridges in County 001. The average bridge in Utah is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
001013V
Year Built
2005
Length
10.7 m (35.1 ft)
Max Span
2.4 m
Lanes
2
Daily Traffic
945
Material
Steel Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.