IRR BIA RTE 13 over HILL CREEK
65 KM SOUTH OF OURAY · County 047, Utah · Built 2013 · 1 Lanes · 2 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
39.6025, -109.740139
This bridge is in worse condition than 47.8% of bridges in County 047. The average bridge in Utah is 0 years old; this one is 13 years old.
Bridge Details
- Structure #
- 0000H62687B0410
- Year Built
- 2013
- Length
- 7 m (23 ft)
- Max Span
- 3 m
- Width
- 3.9 m (12.8 ft)
- Lanes
- 1
- Daily Traffic
- 2
- Material
- Steel
- Design
- Culvert
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.