EAST RANGE RD over STORM DRAINAGE

3.3 KM S OF BRIDGE BVR15 · County 027, Texas · Built 2020 · 2 Lanes · 300 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
DAPFORHOO0BVR85
Year Built
2020
Length
7.6 m (24.9 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$22,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.