BOAZ MOUT SITE RD over UNKNOWN CREEK

BMF-32 · County 027, Texas · Built 2009 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPFORHOO0B0001
Year Built
2009
Length
85.3 m (279.9 ft)
Max Span
21.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.