T.J. MILLS BLVD over PAVED CHANNEL

INTO SANTA FE GATE · County 027, Texas · Built 1960 · 6 Lanes · 5,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
DAPFORHOO00F62B
Year Built
1960
Reconstructed
2004
Length
12 m (39.4 ft)
Max Span
1.8 m
Width
33.1 m (108.6 ft)
Lanes
6
Daily Traffic
5,000
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$7,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.