W. PATROL ROAD over BIG CREEK

BTWN ARTERIAL RDS 2 & 3 · County 037, Texas · Built 1942 · 2 Lanes · 100 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
DAPAMCRIV02086
Year Built
1942
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
7 m (23 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Tee Beam
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.