PROJECT ROAD over TRINITY RIVER
64 KM E HOUSTON OFF I-10 · County 071, Texas · Built 1998 · 2 Lanes · 67 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.812514, -94.731008
This bridge is in worse condition than 26.4% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 28 years old.
Nearby Bridges
IH 10 over Wallisville-Liberty Rd
Built 2009
IH 10 EB over TRINITY RIVER
Built 2011
IH 10 WB over TRINITY RIVER
Built 2009
IH 10 over FM 563
Built 2007
FM 563 over TURTLE BAYOU
Built 1963
N BAY ST over LONE STAR CANAL
Built 1950
S MAIN ST over LONE STAR CANAL
Built 1996
N TEXAS AVE over LONE STAR CANAL
Built 1996
IH 10 EB ENTR RAMP over OLD/LOST RIVER
Built 1992
IH 10 WB EXIT RAMP over OLD/LOST RIVER
Built 1992
Bridge Details
- Structure #
- CEPSWGTXWLLSVLE
- Year Built
- 1998
- Length
- 98.6 m (323.5 ft)
- Max Span
- 32.8 m
- Width
- 7.8 m (25.6 ft)
- Lanes
- 2
- Daily Traffic
- 67
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $683,000
- Total Project Cost
- $1,025,000