COUNTY ROAD 4795 over COOPER DAM EM SPILLWAY

COOPER DAM SULPHUR RIVER · County 223, Texas · Built 1991 · 2 Lanes · 419 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
CEPSWFTXODCPB02
Year Built
1991
Length
214.2 m (702.8 ft)
Max Span
23.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
419
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$1,444,000
Total Project Cost
$2,166,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.