3RD STREET over NORTH DIVERSION DITCH

2.4 MILES FROM MAIN GATE. · County 441, Texas · Built 1955 · 2 Lanes · 400 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
AFTXFNWZ00434
Year Built
1955
Length
12.8 m (42 ft)
Max Span
3 m
Lanes
2
Daily Traffic
400
Material
Concrete Continuous
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$50,000
Total Project Cost
$75,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.