US 82 over HOBBLE SCOBBLE CANYON

3.45 MI W OF SH 70 · County 125, Texas · Built 1943 · 4 Lanes · 1,899 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
250630013106005
Year Built
1943
Reconstructed
1981
Length
13.6 m (44.6 ft)
Max Span
2.4 m
Width
61.3 m (201.1 ft)
Lanes
4
Daily Traffic
1,899
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.