US 287 SIDE ROAD C over MIDDLE GROESBECK CREEK

9.259MI E OF CHILDRESS CT · County 075, Texas · Built 1971 · 2 Lanes · 11,183 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
250380004301151
Year Built
1971
Length
13.7 m (44.9 ft)
Max Span
2.4 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
11,183
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.