CR 154 over W FORK GONZALES CREEK

0.70 MI OF CR 162 · County 429, Texas · Built 2018 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
232150AA0154002
Year Built
2018
Length
22.9 m (75.1 ft)
Max Span
22.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.