CR 229 over INDIAN CREEK

1.60 MI SW OF FM 586 · County 049, Texas · Built 1989 · 2 Lanes · 31 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

31.504192, -98.997325

This bridge is in worse condition than 59.6% of bridges in County 049. The average bridge in Texas is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
230250AA0229002
Year Built
1989
Length
18.6 m (61 ft)
Max Span
9.1 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
31
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$116,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.