FM 2940 over PAINT CREEK

3.60 MI E OF SH 279 · County 049, Texas · Built 1990 · 2 Lanes · 123 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

32.038436, -99.070453

This bridge is in worse condition than 59.6% of bridges in County 049. The average bridge in Texas is 0 years old; this one is 36 years old.

Nearby Bridges

Bridge Details

Structure #
230250272703003
Year Built
1990
Length
38.1 m (125 ft)
Max Span
12.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
123
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.