WHALEN RD over DRAINAGE DITCH
0.33 MI NE OF BU 77 · County 061, Texas · Built 1999 · 2 Lanes · 750 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
26.169039, -97.66035
This bridge is in worse condition than 68.6% of bridges in County 061. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
HAINE DR over DRAINAGE DITCH
Built 1992
BUS 77 over Drainage Ditch
Built 1946
BUS 77 over DRAINAGE DITCH
Built 1997
LP 499 over ARROYO COLORADO
Built 1978
BUS 77 over Arroyo Colorado
Built 1947
US 77 over CCDD #3 LATERAL V
Built 2004
US 77 NB over FM 509 (HELEN MOORE RD)
Built 2005
US 77 SB over FM 509 (HELEN MOORE RD)
Built 2004
US 77 NB over FM 801 (Ed Carey Dr)
Built 2005
US 77 SB over FM 801 (Ed Carey Dr)
Built 2005
Bridge Details
- Structure #
- 210310E01310001
- Year Built
- 1999
- Length
- 6.9 m (22.6 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 750
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.