FM 509 over HARLINGEN AIRPORT DRAIN
1.00 MI N OF FM 1595 · County 061, Texas · Built 2001 · 2 Lanes · 1,296 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
26.231144, -97.632472
This bridge is in worse condition than 14.7% of bridges in County 061. The average bridge in Texas is 0 years old; this one is 25 years old.
Nearby Bridges
SEARCY ROAD over CCWID#1 MAIN NORTH DRAIN
Built 2006
GRIMES AVENUE over DRAINAGE DITCH D
Built 1991
LP 499 over DRAINAGE DITCH
Built 1976
FM 507 over DRAINAGE DITCH
Built 2003
FM 106 LIFT BRIDGE over ARROYO COLORADO
Built 1953
FM 508 over CCWID#1 MAIN N DRAIN
Built 1987
HOENING RD over NORTH MAIN DRAIN
Built 1995
CEMETERY RD over ARROYO COLORADO
Built 2000
FM 1420 over DRAINAGE DITCH
Built 2002
FM 106 over DRAINAGE DITCH
Built 1979
Bridge Details
- Structure #
- 210310236901002
- Year Built
- 2001
- Length
- 11 m (36.1 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 1,296
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.