US 83 EB over WHITE RANCH RD
0.90 MI E OF FM 733 · County 061, Texas · Built 2008 · 4 Lanes · 35,667 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
26.173842, -97.801561
This bridge is in worse condition than 14.7% of bridges in County 061. The average bridge in Texas is 0 years old; this one is 18 years old.
Nearby Bridges
US 83 WB over WHITE RANCH RD
Built 2008
FM 733 over US 83
Built 1970
US 83 EB over FM 800
Built 2008
US 83 WB over FM 800
Built 2008
US 83 WB over FM 506
Built 2009
US 83 EB over FM 506
Built 2009
US 83 EB over ALTAS PALMAS RD
Built 2007
US 83 WB over ALTAS PALMAS RD
Built 2007
US 83 WB over RABB RD
Built 2008
US 83 EB over RABB RD
Built 2008
Bridge Details
- Structure #
- 210310003919399
- Year Built
- 2008
- Length
- 71.9 m (235.9 ft)
- Max Span
- 33.5 m
- Width
- 21.6 m (70.9 ft)
- Lanes
- 4
- Daily Traffic
- 35,667
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.