CR 2790 over CROW CREEK

0.7 MI E OF FM 1632 · County 457, Texas · Built 1975 · 1 Lanes · 10 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
202290AA0158001
Year Built
1975
Reconstructed
2000
Length
12.8 m (42 ft)
Max Span
4.3 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.