JAP LANE over ANDERSON GULLY
0.45 MI E OF FM 105 · County 361, Texas · Built 1960 · 2 Lanes · 443 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.078606, -93.967797
This bridge is in worse condition than 63.6% of bridges in County 361. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
FM 105 over ANDERSON CREEK
Built 1952
TERRY RD over ANDERSON GULLY
Built 1940
CHURCH HOUSE RD over ANDERSON GULLY
Built 2001
FM 1135 over SRA IRRIGATION CANAL
Built 1954
FM 1135 over COW BAYOU TRIBUTARY
Built 1954
CONCORD RD over ANDERSON GULLY
Built 1996
TANGLEWOOD DR. over DRAW
Built 2006
ALAMO STREET over DRAIN
Built 1941
FM 1135 over SRA IRRIGATION CANAL
Built 1954
EVERGREEN DR over DRAINAGE DITCH
Built 2015
Bridge Details
- Structure #
- 201810AA0359001
- Year Built
- 1960
- Length
- 28.3 m (92.8 ft)
- Max Span
- 9.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 443
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.