US 90 BUS over COOPERS GULLY

1.30 MI S OF IH 10 · County 361, Texas · Built 1953 · 5 Lanes · 4,449 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
201810002815071
Year Built
1953
Length
24.1 m (79.1 ft)
Max Span
7.9 m
Width
23.6 m (77.4 ft)
Lanes
5
Daily Traffic
4,449
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.