IH 10 over SH 62

2.40 MI W OF FM 3247 · County 361, Texas · Built 2003 · 6 Lanes · 42,348 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
201810002811235
Year Built
2003
Length
97.5 m (319.9 ft)
Max Span
36 m
Width
35.4 m (116.1 ft)
Lanes
6
Daily Traffic
42,348
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.