IH 10 over TERRY GULLY

0.4 MI W OF FM 1132 · County 361, Texas · Built 1952 · 10 Lanes · 60,095 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
201810002811067
Year Built
1952
Reconstructed
2006
Length
20.7 m (67.9 ft)
Max Span
2.4 m
Lanes
10
Daily Traffic
60,095
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.